Feasibility study summary
The study the whole project is built on, in summary: the production model, the cost structure, the yield assumptions, the price scenarios, and the sensitivity behind every figure published on this site.
Investor Relations — Reporting
Tibbi Silivri is built and equipped. Electrical works and first planting are still ahead, so there is no production year to report on yet and no distribution has been made. This page is honest about both halves: the documents that exist now, and the reporting that begins when the crop does.
Available today
These exist now. They do not sit behind a download button, because who reads them and what they are used for matters to us, and because the right version to send depends on what you are trying to decide. Ask the investor desk and they are sent to you.
The study the whole project is built on, in summary: the production model, the cost structure, the yield assumptions, the price scenarios, and the sensitivity behind every figure published on this site.
The facility as it stands — the greenhouse specification, the growing system, the climate and irrigation equipment, and the phase plan from where the site is now to first harvest.
The material behind the ESG pages: the EU Taxonomy technical screening and minimum-safeguards assessment Efarms has prepared for itself, the CBAM position, and the water and energy figures the site publishes.
Written by us, from the feasibility study and from the site. None of it is audited — an audit needs a trading year, and there has not been one yet.
Polycarbonate side cladding at Tibbi Silivri — the asset the reporting will describe.
Once production begins
None of this exists yet, and we will not pretend otherwise. It is the reporting cycle written into the management contract, and it starts when the first crop does.
Every quarter: what was planted, what was harvested, what it sold for, and what happened in your own allocated area. Issued to every partner at the same time, whatever the size of the allocation.
The calculation behind each distribution: net profit for the period, the 30% operator share, corporate tax, and your pro-rata part of the remaining 70%.
Statutory annual accounts for the operating company, prepared after the first full production year closes.
An independent audit of the annual accounts, once there is a trading year to audit. We will name the firm when it is appointed.
Dates follow first planting, which is not fixed yet. The reporting cycle, its contents and its timing are established in the signed management contract — that document governs, not this page.
Access
Whatever level you are at, the figures are the same figures. What changes is how much of the document behind them you can open.
Everything published on this website — the feasibility-based projections, the price scenarios, the allocation calculator and the market notes — is open, with no sign-in and no request.
The feasibility summary, the project and technical overview and the ESG documentation are sent after a conversation with the investor desk.
Partners who have completed KYC verification sign in to the Partner Portal, where the documents released to them are held — and, once production begins, the reporting on their own area.
Term sheets and structuring detail are handled on the Vehicles & Structuring page.
A free consultation with the Efarms investor desk — your questions, our numbers, and no obligation of any kind.
Talk on WhatsAppor
We use your address to reply and to send occasional project updates — nothing else. Privacy notice